Friday, September 29, 2023

Shower, Mini-split, Mattress & Sheetrock

 With the insulation done I could install the shower stall and fixtures.

 

That done I started sheetrock.  I started in the bathroom with moisture resistant sheetrock and when that was done I installed the bathroom heater and the in-wall medicine cabinet.



I started sheetrock in the living room area starting with the under loft ceiling and then walls.

I poured a small slab outside and mounted the outdoor portion of the mini-split system on it.

Also, my new mattress arrived and I got it put up in my loft.



Tuesday, September 19, 2023

Painting Beadboard, V-Groove & Varnish

 I put two coats of "Marshmallow" interior paint on the bead board.  It really lightens up the interior of the house.



Then I installed the V-groove pine planks at the peak and on the east gable end and applied two coats of varnish.




 

Now that the power is connected to the house I fired up my circuits.  All are working fine except one circuit. My plan is to troubleshoot that issue tomorrow.


Thursday, September 14, 2023

Electrical Hookup & Beadboard

Today a small crew arrived and ran the underground cable to hook up the electric to the house. They say that within a couple of days some techs from the power company will arrive and move the meter from the temporary pole to the house. 



 During the past few days I've been installing beadboard plywood on the ceiling and in the loft.

Beadboard Plywood

 

It was a difficult task to do alone as the inside of the ceiling is sloped and gravity was working against me.  It took me several sheets before I figured out a reasonable way to accomplish it.



The space above the beadboard in the main part of the house and the east end gable wall will be covered with natural finish V-groove pine.

Tomorrow I'll get started painting the beadboard.


 

 

 

Wednesday, September 6, 2023

Insulation

 Today I completed the insulation...crawl space, roof & walls all insulated and I'm glad it's done.  Next step is to start covering the walls.

Roof Insulation

Roof Insulation

Loft Roof Insulation

Wall Insulation

Wall Insulation

Wall Insulation

Wall Insulation

Insulation Complete

Insulation Complete

Thursday, August 24, 2023

Vapor Barrier & Shovel Work

 Today I finished insulating the floor (in the crawl space) and laying out the crawl space vapor barrier.  Happy to be done working in the crawl space as it's uncomfortable and awkward. 

Vapor  Barrier

In the past few days a few inconvenient things have happened:

1.  During the building inspection I was told that I need a clean-out fixture between the house and the septic tank.  So, I'll need to dig up the waste pipe and put in the clean-out.

2.  The electric company came by to flag out the path for the underground power from the pole to the house.  When the driveway was put in the excavator put in a conduit running under the driveway for the power cable to run through.  For some unknown reason he left the end of the conduit north of the driveway exposed above ground but buried the conduit south of the driveway.  So, I need to dig that up so the power company can run their cable under the drive.

3.  Two days ago I got up and found my yard flooded.  Seems the underground water pipe broke.  So, now I need to dig up the water pipe and repair it.

I don't really like shoveling so I'm going to hire my grandson and a friend or two of his to do the digging for me.  Sounds like they're going to start tomorrow morning.

Once we locate the conduit under the drive the power company will come and hook the main meter to the house.  They, I'll have power in the house to all of the lights and outlets and won't need to use an extension cord from the temporary power hook up anymore.



Friday, August 11, 2023

Inspections & Ledger Boards

 This week I passed my framing inspection, plumbing sewer inspection, plumbing water supply inspection and electrical inspection.

One thing I realized during the inspection is that I had wired for 110v for my washer/dryer based on the unit that I plan to purchase.  However, if i should replace it with another unit that requires 220v it would be a pain to wire for that after the fact.  So, today I wired a 220v outlet for a dryer.

Also, during the past few days I've been working on ledger boards for the eventual decks and carport.

It is a time consuming project.  The first step is to apply self-adhesive flashing tape to the side of the house that will be under the ledger board.

Ledger board flashing

 Then, level & install the ledger board.

East ledger board

Then install another layer of flashing tape that starts above the ledger board, covers the top and extends a bit down over the face.

Flashed ledger board

 

Those photos are of the east wall where the primary deck area will be.  I also installed ledger board on the south wall which will have a 6' wide walkway leading to the front door and out to connect to the main deck. I had to temporarily disconnect my current ramp from the house and move it away so that I could install the ledger board and then move it back in and reconnect it.

South ledger board

 

On the west wall, at about the base of the roof slope I installed another ledger board which will allow for connection of a carport.

West wall ledger board

 








Sunday, July 30, 2023

Doors & Windows Done

 Today my son, my son-in-law, two grandsons and my daughter came and assisted me in installing the sliding door.  It is heavy and awkward to handle and in addition is about 6 feet above the ground so it took some doing to get it in place.

The door is the type with the blinds built in between the glass panes.


East Wall


South Wall

West Wall

North Wall





Lots of progress

 Since the last post I've gotten a lot done. Finished the spackling and painting and painted the inside of the front door. I picked up a...