Friday, September 29, 2023

Shower, Mini-split, Mattress & Sheetrock

 With the insulation done I could install the shower stall and fixtures.

 

That done I started sheetrock.  I started in the bathroom with moisture resistant sheetrock and when that was done I installed the bathroom heater and the in-wall medicine cabinet.



I started sheetrock in the living room area starting with the under loft ceiling and then walls.

I poured a small slab outside and mounted the outdoor portion of the mini-split system on it.

Also, my new mattress arrived and I got it put up in my loft.



No comments:

Post a Comment

Lots of progress

 Since the last post I've gotten a lot done. Finished the spackling and painting and painted the inside of the front door. I picked up a...