This week I passed my framing inspection, plumbing sewer inspection, plumbing water supply inspection and electrical inspection.
One thing I realized during the inspection is that I had wired for 110v for my washer/dryer based on the unit that I plan to purchase. However, if i should replace it with another unit that requires 220v it would be a pain to wire for that after the fact. So, today I wired a 220v outlet for a dryer.
Also, during the past few days I've been working on ledger boards for the eventual decks and carport.
It is a time consuming project. The first step is to apply self-adhesive flashing tape to the side of the house that will be under the ledger board.
![]() |
Ledger board flashing |
Then, level & install the ledger board.
![]() |
East ledger board |
Then install another layer of flashing tape that starts above the ledger board, covers the top and extends a bit down over the face.
![]() | |
Flashed ledger board |
Those photos are of the east wall where the primary deck area will be. I also installed ledger board on the south wall which will have a 6' wide walkway leading to the front door and out to connect to the main deck. I had to temporarily disconnect my current ramp from the house and move it away so that I could install the ledger board and then move it back in and reconnect it.
![]() |
South ledger board |
On the west wall, at about the base of the roof slope I installed another ledger board which will allow for connection of a carport.
![]() |
West wall ledger board |