My shower stall arrived this week. I set it up in place to make sure I had accurate measurements for the wall between the shower & the laundry center as well as making sure I had studs in the right places to connect the shower stall to.
![]() |
Test fit Shower Stall |
Once I had my dimensions and placement right I built the wall to the right of the shower stall and added a few strategically placed studs.
Once that was done I started applying Zip System Tape to the joints in the Zip sheathing. I got the west wall completed and started on the south.
No comments:
Post a Comment