Today I finished installing the loft floor and constructed the ridge beam. It is really heavy and I'm not sure yet how I'm going to lift it into place.
Wednesday, November 16, 2022
Subscribe to:
Post Comments (Atom)
Lots of progress
Since the last post I've gotten a lot done. Finished the spackling and painting and painted the inside of the front door. I picked up a...

-
The basic excavation is done. Driveway and parking area are in and gravel covered and the crawlspace area has been scooped out. Driveway ...
-
I've gotten lots of stuff accomplished since the last post. I've managed to get the house to a point where I can move in, though i...
-
Since the last post I've gotten a lot done. Finished the spackling and painting and painted the inside of the front door. I picked up a...
No comments:
Post a Comment