Installed some block supports in the loft joists and got about 3/4 of the plywood decking installed today.
Sunday, November 13, 2022
Subscribe to:
Post Comments (Atom)
Lots of progress
Since the last post I've gotten a lot done. Finished the spackling and painting and painted the inside of the front door. I picked up a...
-
Yesterday I finished installing the sheetrock. Today I started the process of mud and tape. I've never been very good at this, or more...
-
Since the last post I've gotten a lot done. Finished the spackling and painting and painted the inside of the front door. I picked up a...
-
The basic excavation is done. Driveway and parking area are in and gravel covered and the crawlspace area has been scooped out. Driveway ...


No comments:
Post a Comment