I'm still waiting for my replacement roofing items so today I worked on the bathroom floor. I'm planning to finish it with a vinyl flooring so it needed flooring smoother than the 3/4" OSB that is currently there. I covered it with 5mm plywood and that allowed me to also screw down the toilet flange, use adhesive and screws to attach the shower stall base and to glue up the two drains to the waste plumbing system.
Subscribe to:
Post Comments (Atom)
Lots of progress
Since the last post I've gotten a lot done. Finished the spackling and painting and painted the inside of the front door. I picked up a...

-
I've gotten lots of stuff accomplished since the last post. I've managed to get the house to a point where I can move in, though i...
-
A couple of days ago a fellow stopped by to see the house. He & his wife had driven by and were intrigued with a "tiny house...
-
The basic excavation is done. Driveway and parking area are in and gravel covered and the crawlspace area has been scooped out. Driveway ...
No comments:
Post a Comment