I'm still waiting for my replacement roofing items so today I worked on the bathroom floor. I'm planning to finish it with a vinyl flooring so it needed flooring smoother than the 3/4" OSB that is currently there. I covered it with 5mm plywood and that allowed me to also screw down the toilet flange, use adhesive and screws to attach the shower stall base and to glue up the two drains to the waste plumbing system.