I'm still waiting for my replacement roofing items so today I worked on the bathroom floor. I'm planning to finish it with a vinyl flooring so it needed flooring smoother than the 3/4" OSB that is currently there. I covered it with 5mm plywood and that allowed me to also screw down the toilet flange, use adhesive and screws to attach the shower stall base and to glue up the two drains to the waste plumbing system.
Subscribe to:
Post Comments (Atom)
Lots of progress
Since the last post I've gotten a lot done. Finished the spackling and painting and painted the inside of the front door. I picked up a...
-
Today's task was to install soffit blocking on the eaves on both the north & south sides of the roof.
-
Yesterday I finished installing the sheetrock. Today I started the process of mud and tape. I've never been very good at this, or more...
-
When I picked up my order of roofing panels a couple of them were damaged so I had to return them and re-order. Today I installed the last...

No comments:
Post a Comment