Yesterday afternoon I got a call from the septic folks and they had a break in their schedule and wanted to install the septic system today. So they got started this morning, should have it done by end of day and they plan to be back early next week to do the final fill and grading.
Friday, November 4, 2022
Subscribe to:
Post Comments (Atom)
Lots of progress
Since the last post I've gotten a lot done. Finished the spackling and painting and painted the inside of the front door. I picked up a...

-
I've gotten lots of stuff accomplished since the last post. I've managed to get the house to a point where I can move in, though i...
-
A couple of days ago a fellow stopped by to see the house. He & his wife had driven by and were intrigued with a "tiny house...
-
The basic excavation is done. Driveway and parking area are in and gravel covered and the crawlspace area has been scooped out. Driveway ...